Tenant Fitout

After the trench for plumbing or electrical lines is dug and utilities are laid, it’s time to cover it up. Concrete is poured over the trench, providing a solid barrier and protection for the utilities below. This process ensures stability and durability, safeguarding the infrastructure from damage. Once cured, the concrete creates a reliable foundation, allowing for safe passage over the filled trench and ensuring the smooth operation of utilities beneath the surface.

 
Previous slide
Next slide